Fisher Associates was selected by the Town of Amherst for preliminary design, final design, bidding & award, construction administration, resident inspection and post construction phases for a watermain replacement project within the Town of Amherst. This project encompasses designing approximately 3,025 LF of 8-inch watermain, associated hydrants, services and appurtenances along the majority of two stretches of North Forest Road. The first stretch is approximately from the intersection of North Forest and Noel Drive to the intersection of North Forest and Maple Road. The second stretch is approximately from the intersection of North Forest Road and Millersport Highway to the intersection of North Forest Road and Stahl Road. The project required several bores crossing North Forest Road.
Fisher Associates performed horizontal and vertical alignment of the 8” Ductile Iron Watermain, calculated restraint joint lengths, thrust block sizes, spaced fire hydrants at optimal locations, and designed initial and final interconnections to the existing system. Fisher also provided construction administration and residential construction inspection for the project. As part of the inspection, scour velocities, pressure, and bacteriological testing was observed and documented for ECWA and DOH approvals.

What Our Clients are Saying
Fisher Associates has exceeded expectations by completing tasks ahead of schedule and within budget on numerous occasions and if any issues arise, they are quick to report it and offer creative and effective solutions. I am happy to recommend the services of Fisher Associates to others and look forward to continuing to work with them on current and future Town of Amherst projects.
– Jeffrey S. Burroughs, P.E. Town Engineer Town of Amherst