Key Contact

Lisa Oliver, P.E.
Interim Director of Energy
Project Story
Fisher Associates provided a site plan, grading, and drainage plan, erosion, and sediment control plan to support SPDES Permitting for this Solar Site. A Stormwater Pollution Prevention Plan (SWPPP) was prepared for compliance with NYSDEC General Permit for Stormwater discharges from Construction Activities. Fisher supported the project with NYSDEC filings including Notice of Intent (NOI) and Notice of Termination (NOT) once 80% uniform perennial vegetation was achieved.
Services Provided:
- Ecological services
- Regulatory permitting & coordination
- SPDES permitting
- Stormwater compliance inspections
- Site plan
- Grading and drainage plans
- Erosion and sediment control plans
- Access road design