Key Contact

Project Story
The Timber Road wind farm is a two-phase project located in Paulding County, Ohio. Timber Road II consists of 55 Vestas V100 turbines and Timber Road IV consists of 24 Vestas V150 and seven Vestas V136 turbines.
Timber Road II was completed on an accelerated time frame to obtain ARRA funding. The civil design was completed in less than one month, and the DOT permit was obtained in less than one week. Fisher Associates also provided stormwater design and inspection as well as ALTA surveys. Fisher also created a transportation plan and routing for the delivery of the turbines.
Timber Road IV is being completed for commissioning the project in 2020. For this phase of the project, Fisher again worked on the transportation plan for deliveries of the turbine components, as well as DOT permits, SWPPP, and SPCC.
Services provided
- Stormwater management and water quality assessment
- Regulatory permitting and coordination
- Boundary survey
- Right of way survey
- SPDES permitting
- Stormwater compliance inspections
- Site plan
- Grading and drainage plans
- Erosion and sediment control plans
- Access road design